Drawing-based silicone & LSR manufacturing support from Kunshan, China
Quality & Engineering

Define the requirement, control the process, verify the result

Our quality planning starts from the current drawing revision, functional surfaces and agreed acceptance criteria. Inspection depth is matched to project risk and customer requirements.

Precision measurement of a custom molded silicone component
Requirement Alignment

Silicone tolerances must reflect function and measurement method

Elastomer parts can deform under their own weight, measurement force or fixture pressure. We identify the critical dimensions and agree how they should be measured instead of applying unnecessarily tight limits to every feature.

  • Drawing revision and units confirmed
  • Critical and reference dimensions separated
  • Measurement contact force and fixture considered
  • Flash, mismatch, gate and appearance limits located
  • Functional test conditions written where needed
Control Plan

Project checkpoints from incoming material to shipment

Material

Grade, hardness, color and project-required documentation.

First Sample

Dimensions, appearance, assembly and functional observations.

Process

Stable molding conditions, insert handling and defect controls.

Final Inspection

Agreed dimensional, appearance and functional sampling.

Packaging

Part protection, count, identification and shipment readiness.

Inspection Scope

Checks selected around part risk

Not every project needs the same inspection plan. The applicable combination is agreed during quotation and sample approval.

01

Dimensional Inspection

Calipers, gauges, optical methods or dedicated fixtures selected for the geometry and tolerance.

02

Appearance Review

Flash, short fill, contamination, color, surface marks and other agreed visual criteria.

03

Material & Hardness

Material identification and hardness checks aligned with the approved project specification.

04

Bond or Pull Evaluation

Interface checks for overmolded inserts where adhesion or mechanical retention is functional.

05

Leak or Seal Testing

Project-defined pressure, vacuum or assembly checks when sealing performance requires verification.

06

Documentation

Sample records, inspection summaries or customer-specific reports can be defined before order release.

Custom silicone seals and gaskets prepared for inspection
Engineering Communication

Changes stay tied to a drawing revision

Material, dimensions, texture, inserts or test conditions can all affect the mold and process. We recommend documenting changes before the next sample or production run so both teams are evaluating the same requirement.

Submit a Drawing for Review

Send the material, dimensions, application environment and estimated quantity. Our team will review the project and identify the next engineering step.

Start an RFQ